Cheese Producer

Industry Served

Food & Beverage

Solution Delivered

The Problem

The client is a large-sized cheese producer. The temperature and humidity in the pressing and acidification rooms are maintained by individual ceiling mounted units (CMU) that were supplied with hot and cold water for temperature control and water misting for humidity control. The CMU’s were unable to maintain setpoint temperatures and relative humidity and an evaluation of the system was requested.

Key Solutions – Engineered by AVID

Utility Evaluation

Job Completed

South Dakota, USA

An AVID Evaluation

  • Under sized chilled water supply piping.
  • Under sized hot water supply piping.
  • Undersized pumps.
  • Insufficient instrumentation.
  • Insufficient airflow.
  • Insufficient valves.

Recommendations
& Implementation

  • Install additional instrumentation.
  • Change heat exchanger.
  • Install additional piping.
  • Install balancing valves.
  • Install air relief valves.
Following review of the evaluation recommendations, the client requested that installation drawings and specifications be prepared for implementation of the recommendations.

Custom
Solution

What was initially thought to be an equipment issue was determined to be a distribution issue as a result of the evaluation. The recommendations could be implemented without a shutdown or long equipment lead times.

The client implemented the recommendations presented and was subsequently able to meet the set point room temperature and relative humidity.

Next Project

Brewery

Customized Ventilation Strategies for Improved Packaging Operations

Industry Served

Food & Beverage

Explore
Key Solutions – Engineered by AVID
Humidity Reduction / Improved Ventilation
Job Completed
Wisconsin, USA